Educational Integration Plan - Effort Estimation Review
Topic:
internal.educational-effort-estimation
Comprehensive review verifying effort estimates for 12% → 95% educational coverage transformation. Analyzes actual code complexity to validate 100-120 hour estimate with phase-by-phase breakdown.
Educational Integration Plan - Effort Estimation Review
Reviewer Analysis Date: 2025-11-28 Codebase: MathHook CAS (mathhook-core) Scope: Verify estimates for 12% → 95% educational coverage (100-120 hours)
EXECUTIVE SUMMARY
After analyzing actual code complexity in the repository:
- Phase 1 estimates: Mostly REALISTIC (4-5 hours as stated)
- Phase 2 estimates: UNDERESTIMATED by 2-4 hours (need 17-24 instead of 15-20)
- Phase 3 estimates: REALISTIC overall (40-50 hours), but uneven distribution
- Phase 4 estimates: REALISTIC (35-45 hours)
- Grand Total: REALISTIC (100-120 hours is accurate target, but with adjustments noted)
GRAND TOTAL ESTIMATE
| Phase | Original | Revised | Notes |
|---|---|---|---|
| Phase 1 | 4-5 hrs | 4-5 hrs | Accurate |
| Phase 2 | 15-20 hrs | 17-24 hrs | +2-4 hrs (simplify & integrate complexity) |
| Phase 3 | 40-50 hrs | 40-50 hrs | Accurate distribution |
| Phase 4 | 35-45 hrs | 38-50 hrs | +3-5 hrs (testing scope) |
| TOTAL | 100-120 hrs | 105-135 hrs | Reasonable range |
DETAILED FINDINGS BY ESTIMATE TYPE
REALISTIC ESTIMATES (No adjustment needed)
- ✅ Task 1.1 (Export DerivativeWithSteps - 5 min)
- ✅ Task 1.2 (Export integration functions - 5 min)
- ✅ Task 1.3 (Export limit functions - 5 min)
- ✅ Task 2.2 (Second-order ODE steps - 3-4 hours)
- ✅ Task 2.4 (Export functions - 1-2 hours)
- ✅ Task 3.1 (Matrix module - 15-20 hours)
- ✅ Task 3.2 (Factorization steps - 8-10 hours)
- ✅ Task 3.3 (Series explanations - 6-8 hours)
- ✅ Task 3.4 (ODE types - 8-10 hours)
- ✅ Task 4.1 (Unify traits - 8-10 hours)
- ✅ Task 4.2 (Framework - 10-15 hours)
UNDERESTIMATED (Needs adjustment)
-
⚠️ Task 1.4 (simplify_with_steps wrapper)
- Original: 30-60 min
- Actual: 2-3 hours
- Reason: Multi-pass simplification system with 454-line zero detection module
-
⚠️ Task 2.1 (integrate_with_steps)
- Original: 4-6 hours
- Actual: 6-8 hours
- Reason: 4,656 lines of integration code across 15 files; 6+ strategies
-
⚠️ Task 2.3 (Simplification step tracing)
- Original: 6-8 hours
- Actual: 10-12 hours
- Reason: Complex instrumentation of multi-pass system
-
⚠️ Task 4.3 (Testing & documentation)
- Original: 15-20 hours
- Actual: 20-25 hours
- Reason: Testing 95+ operations comprehensively
COVERAGE CALCULATION VALIDATION
Current State:
- 127 mathematical operations audited
- 15 (12%) with educational support
- 103 (81%) with zero support
- 9 (7%) with partial support
To reach 95% coverage: Need 95 total operations with steps Operations to add: 95 - 15 = 80 operations
Time per operation: 100-120 hours ÷ 80 operations = 1.25-1.5 hours/operation average
Breakdown by complexity:
- Trivial (10 ops × 0.25 hrs): 2.5 hours
- Simple (20 ops × 0.75 hrs): 15 hours
- Moderate (30 ops × 1.5 hrs): 45 hours
- Complex (20 ops × 2.5 hrs): 50 hours
- Total: 112.5 hours
Verdict: ✅ The 100-120 hour estimate is REALISTIC
Examples
API Reference
- Rust: ``
- Python: ``
- JavaScript: ``